Al Thumama Stadium: Showcasing Qatari architecture

Al Thumama Stadium, created by Qatari architect Ibrahim M. Jaidah, held the 2021 Amir Cup final on October 22, 2021, to mark its formal opening.

Here is a closer look at the location, which will serve as the site of eight of the 2022 FIFA World Cup matches in Qatar.

Design
Located 12km from central Doha, Al Thumama Stadium is designed to replicate the ‘gahfiya’, a traditional woven cap worn by men and boys across the Middle East and Arab world.

Have fun reviewing movies and drinks

“The design was inspired by the white Qatari gahfiya,” said Khalifa Al Mana, Al Thumama Stadium Operations Manager. “The architect used the patterns and lines of the gahfiya as a reference and incorporated them into the design of the stadium.”

Capacity

The stadium will host 40,000 fans during Qatar 2022.

Location

Al Thumama Stadium is located in a residential area just outside Doha.

“There were many options for the location of this stadium. Following community engagement efforts between the SC and people in Al Thumama, it was decided to build the stadium here to boost the local sporting facilities in the area,” said Al Mana.

Legacy

After the World Cup, around 20,000 seats from the upper tiers will be donated to countries in need of sporting infrastructure. The remaining venue will be used for football and other sporting events.

“Thanks to its location, the stadium will have a strong community legacy,” said Al Mana. “The precinct includes ten football pitches, which will be used by local teams.”

Further precinct facilities will cater for a number of sports, including handball, swimming, basketball, running and cycling. There are also plans to develop retail units, a sports clinic and boutique hotel in the stadium’s upper tiers.

Sustainability 

Al Thumama Stadium recently received a five-star rating from the Global Sustainability Assessment System (GSAS). The stadium’s innovative design supports its sustainability goals. During construction, 40% more fresh water was saved compared to conventional stadium developments, while recycled water is used for the irrigation of green areas. The precinct also includes a 50,000m² park, with native vegetation and almost 400 trees.

Project manager and contractor 

The Al Thumama Stadium project was managed by TiME Qatar. Al Jaber Engineering LLC and Tekfen Construction were the main project contractors. Khalifa Al Mana is the Operations Manager at Al Thumama Stadium.

Tournament mode

During the FIFA World Cup, Al Thumama will host eight matches through to the round of 16 stage, including:
November 21: Senegal v Netherlands (Group A)
November 23: Spain v Costa Rica (Group E)
November 25: Qatar v Senegal (Group A)
November 27: Belgium v Morocco (Group F)
November 29: Iran v USA (Group B)
December 1: Canada v Morocco (Group F)
December 4: Group D winner v Group C runner-up (round of 16)

Leave A Reply

Your email address will not be published.